Server equipment in a server room will require special attention when a server move or server relocation is being planned. A dedicated team of Professional Server Movers such as www.Server-Movers.net is necessary to ensure your Server Relocation will be executed without any problems. A Server Migration will involve moving your Server Equipment from the old location and setting it up at the new location. Normally, this includes de/re-racking, packing and secure transport.

Business Impacts

The impact of the Server Move on a business needs to be minimal to reduce the amount of downtime. Servers are normally the last piece of equipment to be turned off and the first to be turned on. This means a move for a business will require a schedule with a strict time frame. Expert Server Movers are an important aspect of any Server Moving project. The only task of a Server Moving Company will be to ensure the move is completed on time and meets predefined quality standards.

Relocation Complexity

Technicians who are highly experienced such as www.Server-Movers.net will be the best choice for a Server Equipment Relocation project. Servers in use at a business may be a standard type or be set up based on a custom environment. Server Movers may need to contact the manufacturer for information during the planning phase for the move if items are leased.

A Server Migration will typically involve multiple stages.

Pre-Move Activities

The first thing Professional Server Movers will do is perform a hardware audit/inventory and create a schedule. This involves an assessment of the existing location, the new location, and the serial numbers of Server Equipment that will be moved. A service impact analysis is also performed to determine any dependencies and impacts on any Service Level Agreements. The goal is to ensure minimal business disruption for the client. Normally the client handles power down sequence. All equipment is photographed at the origin site to use when re-racking equipment at the new location. Many times, a client also provides a VISIO diagram. Backups will also be made of the data which are normally the responsibility of the client.

Decommissioning the Servers

Server power down should not be made until a backup has been made and verified. The backup will then need to be secured. Servers are the last pieces of equipment to be powered down at an existing location. They will then be the first pieces of equipment to be turned back on once they are all re-racked at the new location. Connectivity and configuration details are labeled for all the servers on a Server Moving sheet are usually the client responsibility.

Packing the Equipment

Bubble wrap and other special packing materials are used for packing Server Equipment. Cages will also be used that are foam lined. Smaller items that will be moved are placed in an appropriate moving box. Air ride vehicles may be used for transporting Server Equipment to the new location. Fixing points in the moving vehicle are used to secure any Server Racks with protection provided for rack corners.

Re-commissioning the Servers

The schedule and time frame for any business Server Relocation will include reestablishing server connections at the new location. An inventory control sheet should be provided that will be used for reference to ensure all equipment is present. An optional cable management process is used to ensure proper cable routes are used and server racks will be accessible for service. Each piece of equipment is then reassembled in the correct configuration with the proper connections put in place. This includes mouse, keyboard, and any monitor.

Final Checks

The server equipment can then be powered up once the set and connections are complete. Components will be checked to make sure they function correctly. Testing will then be done.

Server Relocation when done by experts such as www.Server-Movers.net is a great opportunity to enhance the current configuration of a server room for future growth. Server Movers can assist any company with server rack design and a configuration for a new location. A variety of options and customizations are available based on the needs of a client.